Nat West – Cheque clearing system

The Scenario

NatwestNat West operates a cheque clearing system on behalf of other UK clearing banks.

A number of major changes were planned in the cheque clearing scheme – decentralisation of payments, a requirement to clear cheques within a shorter period (3 days) and the availability of new improved (but very expensive) cheque handling and reading equipment. These changes prompted a major change in the way that Nat West operated the system.

The Challenge

Natwest Case StudyOver 3.5 million cheques are handled by the system every day with strict service quality targets. Nat West needed to migrate in stages to the new process whilst ensuring continuity of service during the transition.

The process was highly complex and the planning needed to take account of:

  • 5 main types of expensive sorting equipment
  • 26 main sorting steps
  • Introduction of new technology for greater efficiency in the sorting process (e.g. magnetic ink and optical character recognition)
  • Volumes predicted to increase to well over 4 million daily
  • Gradual decentralisation of payments to local branches requiring a new sorting regime
  • Demands for increase quality and speed of service

The danger was that Nat West would either over-invest or fail to meet service quality targets, or both. Nat West decided that they needed absolute confidence in the transition process before they could proceed.

The Solution

Natwest Case StudyNat West’s Project Director commissioned Paragon to produce a highly flexible model of the clearing process. The model calculated the time for each sorting task and modelled the complex sorting sequence across different machine types showing process times and revealing any bottlenecks. New machinery could be introduced in stages through the Paragon Scenario Manager to examine the effect on overall process performance.

The flexibility of the model allowed experimentation with a much greater variety of operating ideas than could otherwise be examined.

Predicted volumes for each phase of the decentralising programme could be entered via the Paragon Data Manager to test performance and results compared using the Paragon Results Manager.

The Benefits

Natwest Case StudyThe model provided by Paragon was operated by Nat West to reveal the optimum number of sorting machines needed at each stage of the decentralisation programme in order to plan operations and capital expenditure. Nat West was able to minimise both the disruption and the costs of the migration programme by examining various smarter scheduling options.

As a result, Nat West could have confidence in their migration programme. Even if predicted cheque volumes changed, the model could be updated with new data to see the impact and, if necessary, to re-plan.

Download this case study as a PDF.

case studies

World Business Council for Sustainable Development

***New*** ...Cement Sustainability Initiative Sectoral Model

A business model used to significantly reduce the carbon produced from the world-wide cement trade...more details>>>

United Utilities

Waste Management & Recycling

United Utilities wins a competitive tender using animated simulation to convince the customer their design will perform....more details>>>

ThyssenKrupp

One of the world's biggest technology groups

A model to support a competitive aerospace industry tender bid. The bid challenged conventional industry practice and offered improved returns through automation and labour reduction....more details>>>

In-House Modelling

Partnering with internal modelling, analytical and OR teams

How we've worked as part of a company's internal management team, working alongside to provide technical skills and resources, and modelling best practice...more details>>>

Transport

A major public transport provider

To provide them with information for bidding against new tenders and for re-planning every year once it knows which tender/routes have been won...more details>>>

Xerox

Office products, workflow and document management

Major investment in an assembly area for a new breed of printer - needed an animated model of the assembly circuit for Xerox to operate...more details>>>

A FTSE 100-listed financial services group

Offers a broad portfolio of insurance, pension and investment products and services

A model to set and achieve sales and marketing revenue targets in order to meet investors' expectations at the same time as reconcile top-down targets with the necessary bottom-up planning...more details>>>

Ibstock

One of the UK's largest brick manufacturers

A need to plan for maximum throughput in times of high demand (and prices) and greatest resilience to downturns and price erosion....more details>>>

BAA

Terminal 5

A generic simulation tool that showed BAA the impact on passengers of varying aircraft schedules and plane types, future passenger volumes and check-in resources...more details>>>

Sellafield

Fuel manufacture & reprocessing, and waste remediation and decommissioning

A simulation that identified the throughput capability of a waste processing system, and enabled savings in costs in excess of £100m...more details>>>

Providers of merchant payment processing services

Supplies variety of outsourced in-bound contact centre, data processing & customer support services

A simulation model to help analyse and optimise the operation of the EFT process service centre...more details>>>

North Ayrshire Social Services

Social care in North Ayrshire

Understand and measure how changing the management of services reduced the frequency and impact of delayed hospital discharges for elderly and disabled people...more details>>

Nat West

Nat West operates a cheque clearing system on behalf of other UK clearing banks

Commissioned to produce a highly flexible model of the clearing process, examining a variety of operating ideas and analysing the effect on overall process performance...more details>>>

Tesco

Distribution Centre

Tesco needed an independent assessment of the impact of proposed changes and whether efficiency and loading time targets would be met. The materials handling supplier recommended Paragon Simulation....more details>>>

NHS

Accident & Emergency Facilities

Consolidation of local NHS Accident & Emergency facilities to improve services and reduce the costs compared to the existing multiple smaller facilities....more details>>>

Outokumpu

Worldwide stainless steel manufacture

A generic simulation of stainless steel process enabled them to reduce inventory, increase efficiency, and produce schedules that minimised waste....more details>>>

Wedgwood

Fine China Products

Paragon used the model to confirm and demonstrate the cause and extent of the problems envisaged on overall centre operation of their new multi-million pound automated storage and retrieval system....more details>>>