SellafieldSellafield Limited - Capacity Planning

 

“At least £100m of costs have been avoided as a result of the work”

The Scenario

BNFL is an innovative world leader in harnessing the power of nuclear technologies. BNFL employs around 10,000 people and its activities cover nuclear site decommissioning and clean-up as well as technology services and solutions across the nuclear fuel cycle.

The Challenge

SellafieldBNFL was faced with evaluating the impact of a major change in requirements on a well-advanced new plant design. Numerous teams were responsible for the design of individual systems and each proved their system would perform to the new specification. However, BNFL still needed to answer the following questions:

  • Would the plant as a whole perform as required?
  • How could they minimise inefficiencies emerging from the real-life interaction between systems?

The Head of the Business Improvements (BI) team at BNFL led a group using advanced dynamic simulation methods and workshop data development techniques. He decided to ask Paragon Simulation to work with his team to help them solve the problem.

The Solution

The cross-functional team consisting of designers, operators, maintainers, BI specialists and Paragon Simulation, jointly developed a model. Leading edge modelling technologies were deployed to simulate the operation of the whole plant including the realistic losses resulting from the interaction between systems.

At group workshops a large 3D animation was projected so that the team could watch the model of their process operate and challenge it. Separating the process data and results from the model using the Paragon Information Manager brought clarity of understanding that was shared across the teams.

The modelling system as a whole helped to resolve assumptions about how the systems would interact. It won the hearts and minds of designers and the model became an in-house means of communicating ideas between teams.

The Benefits

The plant performance predicted by the model revealed that the change in requirements would create a shortfall in throughput capability. This outcome challenged prevailing expectation. However, following joint analysis, the result was accepted. Having accepted the result, BNFL were then able to use the model to help them make and test design changes.

The project was peer reviewed by leading independent practitioners who reported the modelling approach to be both best-in-class and fit-forpurpose, and that the methodologies deployed were leading edge. The model now sits within the BNFL Project Team to be used by designers, engineers and managers faced with making decisions based on complex cost-benefit analysis.

BNFL’s Head of Business Improvement reflecting on the whole experience said:

“The model helped to form a correct understanding of the performance of a complex plant. It revealed to the team the key changes needed and created confidence that the proposed design was robust. Joint development helped to cultivate a shared understanding of the whole design. The model was subject to rigorous challenges and an external peer review and therefore it was difficult to disagree with the overall result. The model continues to refine the design in a way that is considerably improving the likelihood of success. At least £100m of costs have been avoided as a result of the work.”

Download this case study as a PDF.

case studies

World Business Council for Sustainable Development

***New*** ...Cement Sustainability Initiative Sectoral Model

A business model used to significantly reduce the carbon produced from the world-wide cement trade...more details>>>

United Utilities

Waste Management & Recycling

United Utilities wins a competitive tender using animated simulation to convince the customer their design will perform....more details>>>

ThyssenKrupp

One of the world's biggest technology groups

A model to support a competitive aerospace industry tender bid. The bid challenged conventional industry practice and offered improved returns through automation and labour reduction....more details>>>

Xerox

Office products, workflow and document management

Major investment in an assembly area for a new breed of printer - needed an animated model of the assembly circuit for Xerox to operate...more details>>>

Ibstock

One of the UK's largest brick manufacturers

A need to plan for maximum throughput in times of high demand (and prices) and greatest resilience to downturns and price erosion....more details>>>

BAA

Terminal 5

A generic simulation tool that showed BAA the impact on passengers of varying aircraft schedules and plane types, future passenger volumes and check-in resources...more details>>>

Sellafield

Fuel manufacture & reprocessing, and waste remediation and decommissioning

A simulation that identified the throughput capability of a waste processing system, and enabled savings in costs in excess of £100m...more details>>>

Tesco

Distribution Centre

Tesco needed an independent assessment of the impact of proposed changes and whether efficiency and loading time targets would be met. The materials handling supplier recommended Paragon Simulation....more details>>>

NHS

Accident & Emergency Facilities

Consolidation of local NHS Accident & Emergency facilities to improve services and reduce the costs compared to the existing multiple smaller facilities....more details>>>

Outokumpu

Worldwide stainless steel manufacture

A generic simulation of stainless steel process enabled them to reduce inventory, increase efficiency, and produce schedules that minimised waste....more details>>>