About Modelilng

United UtilitiesUnited Utilities Tender success for Waste Treatment Facility

The Scenario

United Utilities’ core business activities are water and wastewater treatment. Recognising that many of the skills in operating these facilities could be transferred to the Municipal Solid Waste sector, United Utilities is in the process of tendering for a number of contracts to build and operate waste recycling and treatment facilities. One of the contracts tendered, in conjunction with Interserve, was for a new waste recycling and treatment facility for Derbyshire County Council and Derby City Council. The solution tendered utilises two technologies, Mechanical Bio Treatment (MBT) and Gasification. Both technologies are common in mainland Europe but have only limited reference sites in the UK.

The facility will recycle materials from the waste that it receives and then will treat approximately a third of the waste through the MBT plant, which is an enhanced composting system. This system works by reducing the moisture content and therefore the volume of waste and then provides a stream of waste from which it is easier to remove recyclable materials The overriding objective of the project is to enable the Councils to exceed their joint recycling target of 55% by 2020, minimise landfill costs and utilise waste gases for electricity production. The remaining waste is then processed through the Gasification plant which will, in addition to diverting waste from landfill, generate enough electricity to power some 14,000 homes. The contract on offer was set to run for 27 years.

The Challenge

United Utilities had to provide a proposal to the two Councils, and also had to demonstrate that they could successfully receive and handle the waste tonnages planned to be delivered to the facility. They faced strong competition from several other bidders.

The facility capacity was set at 200,000 tonnes per year, and the aim of the plant is to recycle and divert some 180,000 tonnes per year from landfill. While the facility is located adjacent to a major road in Derby, United Utilities wanted to be able to demonstrate that the vehicles delivering waste could be accommodated on site and turned around within the specified time periods. Waste tonnages will vary on a daily basis but the highest tonnages are predicted to be in the first two weeks of the year, during the clear up of waste generated over the Christmas and New Year holidays. During this period some 150 vehicles per day are expected to visit the site.

United Utilities needed to understand the vehicle logistics, equipment processing requirements and storage capacities in order that it could size and price the facility. In addition it needed to convince the Councils that their design was robust, well planned and would meet their requirements, and to devise the best operating strategy.

The Solution

Paragon worked closely with United Utilities in a series of specification workshops to analyse the planning issues and then to generate an initial model of the facility. The prototype allowed the United Utilities team to see their design in action and even to see key differencesbetween different solutions and processing regimes. The model was calibrated to match, and configured to replicate the performance of an existing installation which gave United Utilities confidence in the model’s accuracy and relevance to the real world.

The model revealed a number of bottlenecks in United Utilities original design. Using the model, United Utilities and Paragon were able to develop a revised design and operating strategy capable of meeting tender requirements. The robustness of the plant design and operating strategy – and the knock-on consequences - in the event of equipment breakdowns or peaks in demand (such as post-Christmas) was also tested using the model.

The Results

The highly experienced Paragon modelling team helped United Utilities to incorporate all the factors that could affect the successful running of the plant.

In addition to the modelling outputs and reports, Paragon developed a video of the facility operation directly linked to one of the model simulations. This video was used as part of the tender meetings and presentations to the Councils. It is understood that United Utilities were the only tenderer to use a computer simulation model to demonstrate their capability to deliver the project.

The feedback given by the model for the treatment facility allowed the model to be amended to allow remote Waste Transfer Stations (WTS to also be modelled. This enabled United Utilities to again check design assumptions made for the WTS and to minimise the turn around time for DCC’s refuse collection vehicles.

Paragon Simulation’s modelling work played a major part in United Utilities being named as preferred bidder for the Derbyshire Waste Management Project with the two Councils and continues to be used as detailed design of the facility is carried out. In addition the model has given potential funders and their advisers confidence that United Utilities and Interserve can build and operate a successful facility.

Your work was invaluable in allowing us to understand the potential bottlenecks in the plant and it allowed us to validate key design and operational parameters. We have therefore been able to gain significant confidence in the proposed design and allowing us to demonstrate to client, our board and project funders the robustness of the proposal. The service provided to me by the Paragon modelling engineers has been first class.” - Blair Marriott, United Utilities Project Director.

Download this case study as a PDF.

case studies

World Business Council for Sustainable Development

***New*** ...Cement Sustainability Initiative Sectoral Model

A business model used to significantly reduce the carbon produced from the world-wide cement trade...more details>>>

United Utilities

Waste Management & Recycling

United Utilities wins a competitive tender using animated simulation to convince the customer their design will perform....more details>>>

ThyssenKrupp

One of the world's biggest technology groups

A model to support a competitive aerospace industry tender bid. The bid challenged conventional industry practice and offered improved returns through automation and labour reduction....more details>>>

Xerox

Office products, workflow and document management

Major investment in an assembly area for a new breed of printer - needed an animated model of the assembly circuit for Xerox to operate...more details>>>

Ibstock

One of the UK's largest brick manufacturers

A need to plan for maximum throughput in times of high demand (and prices) and greatest resilience to downturns and price erosion....more details>>>

BAA

Terminal 5

A generic simulation tool that showed BAA the impact on passengers of varying aircraft schedules and plane types, future passenger volumes and check-in resources...more details>>>

Sellafield

Fuel manufacture & reprocessing, and waste remediation and decommissioning

A simulation that identified the throughput capability of a waste processing system, and enabled savings in costs in excess of £100m...more details>>>

Tesco

Distribution Centre

Tesco needed an independent assessment of the impact of proposed changes and whether efficiency and loading time targets would be met. The materials handling supplier recommended Paragon Simulation....more details>>>

NHS

Accident & Emergency Facilities

Consolidation of local NHS Accident & Emergency facilities to improve services and reduce the costs compared to the existing multiple smaller facilities....more details>>>

Outokumpu

Worldwide stainless steel manufacture

A generic simulation of stainless steel process enabled them to reduce inventory, increase efficiency, and produce schedules that minimised waste....more details>>>